All pages
How we build your shower
Materials
Projects
Contact
Print
Switch theme
CROWLEY'S
Granite & Quartz
Shower remodel checklist
What to decide and what to do, with the stage each is needed by.
Customer
Address
Start date
Decisions
Curbless or curbed entry
stage 3
Niche count, size, and placement
stage 3
Bench, if you want one
stage 3
Grab bar locations, even if you want them later
stage 3
Shower valve and trim, with finish
stage 4
Showerhead type
stage 4
Drain style and finish
stage 4
Wall material, approved on the actual slab
stage 8
Base: tile or solid stone
stage 7
Glass layout and hardware finish
stage 9
Paint color for touch-ups
stage 10
Before demolition day
Empty the bathroom, including drawers and cabinets
Clear art and fragile items from the work path
Confirm the door we use, and parking
stage 1
Arrange another shower for about two weeks
Plan for pets and small children
Show us the main water shutoff
Agree on access and working hours
Notify the HOA or building, if you have one
During the build
Be reachable while the walls are open
stage 2
Keep inspection day clear
stage 4
Leave the shower empty for the templates
stage 7
Approve seam placement and veining
stage 8
Walk the finished shower with us
stage 10
After
Wait to shower until we confirm the caulk has cured. First use:
Use stone-safe cleaners only, never vinegar or bleach
Squeegee the glass and walls after showers
Ask about the sealing schedule for your material
File your paperwork and warranty
Your selections
Wall material
Base, tile or solid stone
Entry
Niche and bench
Valve and trim
Showerhead
Drain
Glass and hardware
Paint color
Notes